‘Topping Out’ At Disneyland Resort

Filed in: Disney California Adventure

'Topping Out' At Disneyland Resort  - A traditional "topping out" ceremony took place today (Friday, Oct. 29) on the construction site for the Cars Land area, scheduled to open in 2012 as a new land in Disney California Adventure park, Anaheim, California. The highest piece of steel in the "Cadillac Range," which will be a 125-foot-tall landmark in Cars Land, was put into place by members of the project's construction team. Cars Land will feature rides, shops and food locations modeled on the Radiator Springs community from the Disney•Pixar motion picture "Cars." (Paul Hiffmeyer/Disneyland)

‘Topping Out’ At Disneyland Resort – A traditional “topping out” ceremony took place today (Friday, Oct. 29) on the construction site for the Cars Land area, scheduled to open in 2012 as a new land in Disney California Adventure park, Anaheim, California. The highest piece of steel in the “Cadillac Range,” which will be a 125-foot-tall landmark in Cars Land, was put into place by members of the project’s construction team. Cars Land will feature rides, shops and food locations modeled on the Radiator Springs community from the Disney•Pixar motion picture “Cars.” (Paul Hiffmeyer/Disneyland)

Download Image